Cheap price Cnc Tube Sheet Drilling Machine - Soft Gate Valve Production Line – Oturn

Introduction:


Product Detail

Product Tags

Related Video

Feedback (2)

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" plus the theory of "quality the basic, have faith in the main and management the advanced" for Double Column Cnc Vertical Lathe, 5 Axis Cnc Lathe, Cnc Turning Machine, We persistently develop our enterprise spirit "quality lives the business, credit score assures cooperation and retain the motto inside our minds: consumers very first.
Cheap price Cnc Tube Sheet Drilling Machine - Soft Gate Valve Production Line – Oturn Detail:

1.The operator places the pallet full of valve body workpieces in the loading positioning slot 1 and the loading positioning slot 2 for positioning, and places the empty tray in the loading positioning slot 1 and the unloading positioning slot 2 for positioning.

2.The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 1 to accurately position the workpiece, and the workpiece 1 is clamped and placed in the positioning fixture on the buffer table 1.
At the same time, it grips the processed workpiece 3 (the robot 2 has just gripped it from the machine tool 2), moves to the unloading positioning slot 1 and places it neatly in the pallet as required.
The camera on the robot 1 scans the workpiece on the pallet in the feeding positioning slot 2 to accurately position the workpiece, and the workpiece 4 is clamped and placed in the positioning fixture on the buffer table 2.
At the same time, it grips the processed workpiece 6 (the robot 3 has just gripped it from the machine tool 4), moves to the unloading positioning slot 2 and places it neatly in the pallet as required.

3.The robot 2 clamps the workpiece 1 from the buffer table 1 and runs to the machine tool 1, grips the finished workpiece 2 and clamps the workpiece 1, runs to the machine tool 2, grips the finished workpiece 3 and clamps the workpiece 2, and runs to the buffer table 1. Place the workpiece 3. Robot 2 completes the cycle.

4.The robot 3 grips the workpiece 4 from the buffering table 2 and runs to the machine tool 3, grips the finished workpiece 5 and clamps the workpiece 4, runs to the machine tool 4, grips the finished workpiece 6 and clamps the workpiece 5, and runs to the buffer table 2. Place the workpiece 6. Robot 3 completes the cycle.

dffd
adcdfgvbfgdhb
ndfhjvbfjv
15626

  • We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Hilda from Luxembourg - 2018.06.19 10:42
    It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
    5 Stars By jari dedenroth from Berlin - 2017.01.28 19:59

    Send your message to us:

    Write your message here and send it to us